账号  

密码  

您当前位置:无锡搬家网 >> 搬家论坛 >> 行业知识 >> 搬家资讯 >> 查看搬家

1606

查看

0

回复
主题:提高热风炉工作效率的步骤与方法 [收藏主题]  
admin 当前在线

703

主题

0

广播

0

粉丝
添加关注
级别:管理员
用户积分:0 分
登录次数:175 次
注册时间:2007-03-30
最后登录:2023-05-25
admin 发表于:2018-11-15 08:53:42   | 只看该作者 查看该作者主题 楼主 

提高热风炉工作效率成都收账步骤与方法:一、选择/天燃气锅炉/热风炉/导热油炉/燃煤热风炉工业热风炉蒸纱机/生物质热风炉合适成都找人公司工作模式。热风炉本身有很多种工作模式:手动、点动、连打,球开关等。各种模式都是根据客户成都收账实际操作来自行选择收账。如客户是需要打包木材等比较长成都找人公司物品时,就应该选择连打或者球开关等工作方式,这样可以省去人工按开关的时间,可以非常有效的提高工作效率。

Steps and methods to improve the efficiency of hot blast stove: 1. Selecting suitable working mode of natural gas boiler/hot blast stove/heat conducting oil stove/coal-fired hot blast stove industrial hot blast stove steamer/biomass hot blast stove. There are many modes of operation of the hot stove itself: manual operation, spot movement, continuous play, ball switch and so on. All kinds of models are chosen according to the actual operation of customers. If customers need to pack long items such as wood, they should choose the way of continuous beating or ball switch, which can save the time of manual pressing switch, and can effectively improve work efficiency. 二、选择合适的配套设备

Two, choose the appropriate supporting equipment.

热风炉的工作效率是2s/道,那么如果您的配套设施供应不了热风炉的工作速度的话,明显是浪费时间的。所以前段的配套设备一定要是高效率的,这样才能完全满足热风炉的工作速度和负荷。

The efficiency of hot stove is 2s/channel, so if your supporting facilities can not supply the working speed of hot stove, it is obviously a waste of time. Therefore, the matching equipment of the front section must be efficient, so as to fully meet the working speed and load of the hot blast stove.

三、根据生产量选择成都找人公司数量

Three. Select the number of hot blast stove according to production volume.

工作效率不高有时并不是机器本身的原因,也有可能是设备配备数量的问题。每台设备每天的工作量是一定的,那么用户的产量明显超过设备数量的数倍时,用户就应该考虑增加设备以提高工作效率。

The inefficiency of work is sometimes not the cause of the machine itself, but also the problem of the number of equipments. Every equipment has a certain workload every day, so when the output of users is obviously several times more than the number of equipment, users should consider increasing equipment to improve work efficiency.

 分享到
 
  支持(0) | 反对(0) 回到顶部顶端 回到底部底部
<上一主题 | 下一主题 >
搬家价格,搬家电话,【搬家公司】_无锡搬家网_汇集无锡,江阴,宜兴搬家公司信息 © 2006-2013 版权所有